QUOTE (MahFL @ May 21 2013, 06:00 AM)
JPL engineers admitted the MSL's were overengineered and that the 90 day mission time was very likely to be exceeded, barring some unforseen problem
I assume you mean MER.
I can assure you - all mechanisms etc are tested to 3x the required lifetime. That's not 'over engineered' - that's called engineering margin to guarantee a good shot at reaching your requirements. It's JPL policy. It puts the bellcurve of expected failure centered beyond 90 days.
Squyres has been on record - years after landing - saying he thought maybe 120, if everything went perfectly maybe 180 sols. I'd be interested in exactly where you see JPL engineers describing MER as 'overengineered'. That's not a phrase I've ever heard them use. Required engineering margin....yes. Not 'overengineered'
Plus - the dust was STILL expected to kill the rovers very shortly after 90 sols. This paper by the late great Jake Matijevic details the expected liftspan of the rovers...
http://trs-new.jpl.nasa.gov/dspace/bitstre...9/1/02-0732.pdfSlide 3 explicitly states that the expected useful lifespan of the rovers was 100 sols for MER-B at the 'Hematite' site ( aka Meridiani ) and 92 sols for MER-A at Gusev.
So - maybe you might find an engineer on Sol 500 saying "We obviously tested for more than 90 sols". But BEFORE launch - I challenge you to find any engineer on record stating they expected the rovers to last significantly longer than 90 days. I don't think you'll find it.